Home > Computer science essays > Enhanced Load Balanced Min-Min Algorithm in Cloud Computing

Essay: Enhanced Load Balanced Min-Min Algorithm in Cloud Computing

Essay details and download:

  • Subject area(s): Computer science essays
  • Reading time: 12 minutes
  • Price: Free download
  • Published: 27 July 2024*
  • Last Modified: 27 July 2024
  • File format: Text
  • Words: 3,491 (approx)
  • Number of pages: 14 (approx)
  • Tags: Cloud Computing essays

Text preview of this essay:

This page of the essay has 3,491 words.

ABSTRACT
Cloud computing provides the applications and services presented over the Internet. These services are offered from the data-center all over the world. By using the environments of cloud computing many tasks are requires to be executed by available resources to achieve best performance, to reduce minimum response time, minimum completion time and utilization of resources etc. This paper focuses on the task scheduling and load balancing based on the different kinds of services and results .Using the environments of cloud computing the major problems are task scheduling and load balancing. This paper relates to benefits improved algorithms under the environment of Static & Dynamic cloud computing. According to the different types of scheduling, we define here the priority, efficiency and balances between the tasks respectively. Here proposed algorithm increases the resource utilization and reduces the makespan. In this paper, the experimental results shows the better algorithm from previous and fulfill the requirements of users.
Keywords
Cloud Computing, Load Balancing, Min-Min Algorithm, Meta Task Scheduling.
1. INTRODUCTION
Cloud computing can be defined as a digital service delivery over the internet by different applications that are concluded by computer systems in distributed data canters and it provides a high performance computing based on protocols that allow shared storage and computation over long distances [1]. Cloud computing is measured as internet based computing service as long as by various infrastructure providers on an on-demand basis, so that cloud is subject to Quality of Service(QOS), Load Balance(LB) and other constraints which have direct effect on user expending of resources controlled by cloud infrastructure. Cloud computing as measured now a days to be a very popular because of the many benefits provided by the Cloud infrastructure. Hardware, Software and other services are accessible to users as a utility under an on-demand basis that is charged
Correspondingly to the amount of resources consumed by them. In some cases, Cloud providers use a part of their datacentre infrastructure for private resolutions and provide the rest unused ability as a cloud Service to public clients. Such setting enables cloud to increase the complexity of its resources capably and makes providers get money from such distributions. On the other side of service providing, the users come to be more comfortable and valuable as cloud allows them to enjoy performing their application/service and make them not worry about the infrastructure necessary and its difficulties assassination for their services [1], [2].
In Fig 1, Cloud computing architecture is presented as layered model. Cloud layers are logically divided into three layers, Software as a Service (SaaS), Platform as a Service (PaaS) and Infrastructure as a Service (IaaS) separately from top to bottom. From Fig 1, physical cloud resources (System Level) and middleware abilities form the basis provider of providing IaaS and PaaS in the form of a group of clearly data centres and runtime environment and structure tools which ease the creation, deployment and execution process of application in the cloud. Finally, Cloud Application contains the applications available openly to the end users consuming SaaS services based on subscription model or pay-per-use basis [3].
Figure 1. Cloud Layered Organization.
A. Types of Cloud
A Cloud can be public, private, community or hybrid cloud. For public cloud, the infrastructure of cloud is open for common public or a large industry group. Public cloud always is held by cloud services seller. Where, private operates for a single organization. However, Community Cloud is shared by various organizations and supports a exact community. It may be managed by other (third party) organization. Last type, Hybrid, is a cloud whose infrastructure is a mixture of two or more clouds (i.e. private, community, or public). Hybrid computing is bound together by identical technology which allows data and application transportability [9].
2. RELATED WORKS
Following Job scheduling techniques are currently established in clouds
1) Opportunistic Load Balancing: OLB allocates each task, in random order, to the next machine that is expected to be available, regardless of the task’s expected execution time on that machine [4]. The intuition after OLB is to keep all machines as busy as possible. One benefit of OLB is its easiness, but because OLB does not consider normal task execution times, the mappings it finds can result in very poor makespans.
2) Minimum Execution Time: In compare to OLB, Minimum Execution Time (MET) allocates each task, in random order, to the machine with the best expected execution time for that task, unrelatedly of that machine’s availability [4]. The motivation behind MET is to give each task to its great machine. This can reason a severe load imbalance through machines.
3) Minimum Completion Time: Minimum Completion Time (MCT) assigned each task, in random order, to the machine with the minimum expected completion time for that task [4]. This causes some tasks to be assigned to machines that do not have the minimum execution time for them. The intuition behind MCT is to combine the profits of OLB and MET, while escaping the situations in which OLB and MET perform poorly.
4) Min-min task scheduling algorithm: The Min-min experimental creates with the set U of all unmapped tasks. Then, the set of minimum completion times, M, for each ti ϵ U, is found. Next, the task with the whole minimum completion time from M is selected and assigned to the consistent machine (hence the name Min-min). Last, the newly mapped task is separate from U, and the process repeats till all tasks are mapped (i.e., U is empty) [8]. Min-min is based on the minimum completion time, as is MCT. However, Min-min considers all unmapped tasks throughout each mapping choice and MCT only considers one task at a time. Min-min maps the tasks in the order that changes the machine accessibility status by the smallest quantity that any assignment could. Let ti be the first task mapped by Min-min onto an empty system. The machine that completes ti the earliest, say mj, is also the machine that executes ti the fastest. For every task that Min-min maps after ti, the Min-min experimental changes the availability status of mj by the least possible amount for every assignment. Therefore, the percentage of tasks allocated to their first choice (on the basis of execution time) is likely to be basic for Min-min than for Max-min (defined next). The probability is that a smaller makespan can be achieved if more tasks are allocated to the machines that complete them the earliest and also execute them the fastest.
5) Max-min task scheduling algorithm: The Max-min experimental is very similar to Min-min. The Max-min experimental also starts with the set U of all unmapped tasks. Then, the set of minimum completion times, M, is establish. Next, the task with the overall maximum completion time from M is selected and assigned to the reliable machine (hence the name Max-min). Last, the recently mapped task is detached from U, and the process repeats til all tasks are mapped (i.e., U is empty) [8]. Spontaneously, Max-min attempts to minimize the penalties incurred from performing tasks with extended execution times. Assume, for example, that the metatask being mapped has many tasks with very short execution times and one task with a very long execution time. Mapping the task with the longer execution time to its best machine first permits this task to be executed concurrently with the remaining tasks (with shorter execution times). For this case, this would be a better mapping than a Min-min mapping, where all of the shorter tasks would execute first, and then the extended running task would execute while different machines sit idle. Thus, in cases similar to this example, the Max-min experimental may give a mapping with a more balanced load through machines and a better makespan.
6) Resource Aware Scheduling Algorithm: The algorithm, RASA (Resource Aware Scheduling Algorithm), applies the Max-min and Min-min schemes alternatively to assign tasks to the resources. The algorithm creates a matrix C where Cij denotes the completion time of the task Ti on the resource Rj. If the number of present resources is odd, the Min-min strategy is applied to assign the first task, otherwise the Max-min strategy is applied. The remaining tasks are allocated to their appropriate resources by one of the two schemes. For instance, if the first task is assigned to a resource by the Min-min strategy, the next task will be assigned by the Max-min strategy. In the next round the task assignment starts with a strategy different from the last round. For example if the first round starts with the Max-min strategy, the second round will starts with the Min-min strategy [2]. Experimental results displays that if the number of existing resources is odd it is preferred to apply the Min-min strategy the first in the first round otherwise is better to apply the max-min strategy the first. Substitute exchange of the Min-min and Max-min strategies results in succeeding execution of a small and a large task on different resources and hereby, the waiting time of the small tasks in Max-min algorithm and the waiting time of the large tasks in Min-min algorithm are ignored. As RASA is contain of the Max-Min and Min-Min algorithms and have no time consuming instruction, the time complexity of RASA is O(mn2) where m is the number of resources and n is the number of tasks (similar to Max-min and Min-min algorithms).
7) Improved Max-min Algorithm in Cloud Computing: Max-min algorithm allocates task Ti on the resource Rj where large tasks have maximum priority rather than smaller tasks. For example, if we have one long task, the Max-min could execute many short tasks concurrently while executing large one. The total makespan, in this case is determined by the execution of long task. But if meta-tasks contains tasks have relatively different completion time and execution time, the makespan is not determined by one of submitted tasks. We try to minimize waiting time of short jobs through assigning large tasks to be executed by slower resources. In additional, execute small tasks concurrently on fastest resource to finish large number of tasks during confirming at least one large task on slower resource. Based on these cases, where meta-tasks have standardized tasks of their completion and execution time, they suggested a considerable development of Max-min algorithm that indicates to improve of Max-min efficiency. Proposed improvement increases the chance of simultaneous execution of tasks on resources.
The algorithm computes the estimated completion time of the submitted tasks on every resource. Then the task with the overall maximum expected execution time is assigned to a resource that has the minimum whole completion time. Finally, this scheduled task is removed from meta-tasks and all calculated times are updated and the processing is repetitive til all submitted tasks are executed. The algorithm minimizing the total makespan which is the total complete time in large distributed environment. The proposed algorithm produces mapping scheme similar to RASA in such concurrency executing tasks and minimization of total completion time necessary to finish all tasks. Selecting task with maximum execution time points to select largest task should be executed. While selecting resource consuming minimum completion time means selecting slowest resource in the current resources.
Thus distribution of the slowest resource to longest task allows to access of high speed resources for complete other small tasks concurrently. Also, we get shortest makespan of submitted tasks on current resources nearby concurrently. Not as original Max-min which proposed to be used if and only if submitted tasks is heterogeneous in their completion time and execution time, by means, there are clearly large tasks and small tasks [9].
“Select task with maximum execution time then assign to be executed by resource with minimum completion time” would be changed to “Select task with maximum completion time then assign to be executed by resource with minimum execution time”.
8) LBMM: In this algorithm starts by executing the steps in Min-Min strategy first. It first identifies the task having minimum execution time and the resource producing it. Thus the task with minimum execution time is scheduled first in Min-Min. After that it considers the minimum completion time since some resources are scheduled with some tasks. Since Min-Min chooses the smallest tasks first it loads the fast executing resource more which leaves the other resources idle. So LBMM executes Min-Min in the first round. In the second round it chooses the resources with heavy load and reassigns them to the resources with light load. LBMM identifies the resources with heavy load by choosing the resource with high makespan in the schedule produced by Min-Min. It then considers the tasks assigned in that resource and chooses the task with minimum execution time on that resource. The completion time for that task is calculated for all resources in the current schedule. Then the maximum completion time of that task is compared with the makespan produced by Min-Min. if it is less than makespan then the task is rescheduled in the resource that produces it, and the ready time of both resources are updated. Otherwise the next maximum completion time of that task is selected and the steps are repeated again. The process stops if all resources and all tasks assigned in them have been considered for rescheduling. Thus the possible resources are rescheduled in the resources which are idle or have minimum load.
3. PROBLEM DEFINITION
Due to the NP-completeness nature of the mapping problem, the developed approaches try to find acceptable solutions with reasonable cost considering many trade-offs and special cases. In this study, the proposed algorithms have been developed under a set of assumptions:
 The applications to be executed are composed of a collection of indivisible tasks that have no dependency among each other, usually referred to as metatask.
 Tasks have no deadlines or priorities associated with them.
 Estimates of expected task execution times on each machine in the HC suite are known. These estimates can be supplied before a task is submitted for execution, or at the time it is submitted.
 The mapping process is to be performed statically in a batch mode fashion.
 The mapper runs on a separate machine and controls the execution of all jobs on all machines in the suite.
 Each machine executes a single task at a time in the order in which the tasks are assigned (First Come First Served – FCFS).
 The size of the meta-tasks and the number of machines in the heterogeneous computing environment is known.
In static heuristics, the accurate estimate of the expected execution time for each task on each machine is known a priori to execution and is contained within an ETC (expected time to compute) matrix where ETC (ti ,mj) is the estimated execution time of task i on machine j.
The main aim of the scheduling algorithm is to minimize the makespan. Using the ETC matrix model, the scheduling problem can be defined as follows:
Let task set T = t1, t2, t3, …. , tn be the group of tasks submitted to scheduler and
Let Resource set R = m1, m2, m3, …. , mk
Be the set of resources available at the time of task arrival
Makespan produced by any algorithm for a schedule can be calculated as follows: makespan = max (CT (ti, mj))
CTij = Rj+ETij
Where CT –> completion time of machine
ETij–> expected execution time of job i on resources
Rj–> resources
ready time or availability time of resource j after completing the previously assigned jobs.
The Enhanced Load Balanced Min-Min algorithm is developed to work for the above stated problem.
4. ELBMM: A unique modification of Load Balanced Min-min algorithm is proposed.
In the Second Phase, Load Balanced Min-Min Algorithm selects the task with minimum completion time and assigns it to the corresponding resource, it sometimes doesn’t produce better makespan and doesn’t utilize resources effectively.
So the idea is to select the task with maximum completion time and assign it to the corresponding resource to produce better makespan and utilize resource effectively.
Phase 1: Applying Min-min Strategy
For all tasks Ti
For all resources
Cij = Eij + rj // Finding Completion time of Task ‘i’ on Resource ‘j’
do until all tasks are mapped
for each task find the earliest completion time and the resource that obtains it
find the task Tk with the minimum earliest completion time
assign task Tk to the resource Rl that gives the earliest completion time
delete task Tk from list
update ready time of resource Rl
update Cil for all I
end do
Phases 2: Rescheduling Phase of ELBMM
for all resources R
Compute makespan = max(CT(R))
End for
for all resources
for all tasks
find the task Ti that has maximum ET in Rj
find the MCT of task Ti // MCT=Maximum completion time
if MCT < Makespan
Reschedule the task Ti to the resources that produces it
update the ready time of both resources
End if
End for
End for
FlowChart:
5. AN ILLUSTRATIVE EXAMPLE
Table 1. Expected Execution Time of Tasks
Calculate Expected Execution Time of all tasks on each Resource
Task R1 R2
T1 81.78 23.36
T2 112.95 32.27
T3 121.09 34.59
T4 61.07 17.45
Step 1: Applying Min-min Strategy
Step 2: Applying ELBMM Strategy
Makespan by applying ELBMM – 84.31 second
6. RESULTS AND DISCUSSION
Below Figure represents that the Makespan (Total Completion Time of all tasks in Meta-tasks) by applying ELBMM algorithm is less as compared to LBMM and Min-min.
7. CONCLUSIONS AND FUTURE WORK
Load Balanced Min-Min Algorithm selects the task with minimum completion time and assigns it to the corresponding resource, it sometimes doesn’t produce better makespan and doesn’t utilize resources effectively while Enhanced Load Balanced Min-min selects the task with maximum completion time and assigns it to the corresponding resource.
Theoretical Result Analysis of LBMM and ELBMM shows that ELBMM produces better makespan and utilization of resources as compared to LBMM.
This study can be further extended by implementing ELBMM algorithm in cloudSim which is java based simulation toolkit that enables modelling, simulation and experimenting on designing cloud computing infrastructures to prove this concept.
8. REFERENCES
[1] Braun, T.D., Siegel, H.J., Beck, N., Boloni, L.L., Maheswaran, M., Reuther, A.I., Robertson, J.P., et al. “A comparison of eleven static heuristics for mapping a class of independent tasks onto heterogeneous distributed computing systems”, Journal of Parallel and Distributed Computing, Vol. 61, No. 6, pp.810–837, 2001
[2] Chapman. C, Musolesi. M, Emmerich. W, Mascolo. C, ”Predictive Resource Scheduling in Computational Clouds” in Parallel and Distributed Processing Symposium, IEEE International Vol. 26, pp.1 – 10, 2007
[3] Ian Foster, Carl Kesselman, Steven Tuecke, “The Anatomy of the Cloud Enabling Scalable Virtual Organizations” International Journal of Supercomputer Applications, 2001.
[4] Siriluck Lorpunmanee, Mohd Noor Sap, Abdul Hanan
Abdullah, and Chai Chompoo-inwai, “An Ant Colony Optimization for Dynamic Job Scheduling in Cloud Environment”, World Academy of Science, Engineering and Technology 29, pp. 314- 321, 2007. [5] Dantong Yu and Thomas G. Robertazzi “Divisible Load Scheduling for Cloud Computing”, PDCS’2003, 15th Int’l Conf. Parallel and Distributed Computing and Systems. IASTED, pp. 1 – 9, 2003.
[6] Kokilavani.T and George Amalarethinam.D.I, Applying Non-Traditional Optimization Techniques to Task Scheduling in Cloud Computing, International Journal of Research and Reviews in Computer Science, Vol. 1, No. 4, Dec 2010, pp. 34 – 38
[7] Saeed Parsa, Reza Entezari-Maleki RASA: A New Cloud
Task Scheduling Algorithm , International Journal of Digital Content Technology and its Applications Volume 3, Number 4, December 2009
[8] Geoffrey Falzon, Maozhen Li, “Enhancing list scheduling heuristics for dependent job scheduling in Cloud computing environments”, Journal of Supercomputing, Springer, March 2010.
[9] Doreen Hephzibah Miriam. D and Easwarakumar. K.S, A Double Min Min Algorithm for Task Metascheduler on Hypercubic P2P Cloud Systems, IJCSI International Journal of Computer Science Issues, Vol. 7, Issue 4, No 5, July 2010.
[10] He. X, X-He Sun, and Laszewski. G.V, “QoS Guided Minmin Heuristic for Cloud Task Scheduling,” Journal of Computer Science and Technology, Vol. 18, pp. 442-451, 2003.
[11] Kamalam.G.K and Muralibhaskaran.V, , A New Heuristic
Approach:Min-Mean Algorithm For Scheduling MetaTasks On Heterogenous Computing Systems, IJCSNS International Journal of Computer Science and Network Security, VOL.10 No.1, January 2010.
[12] Sameer Singh Chauhan,R. Joshi. C, QoS Guided Heuristic Algorithms for Cloud Task Scheduling, International Journal of Computer Applications (0975 – 8887), pp 24-31, Volume 2, No.9, June 2010.
[13] Singh. M and Suri. P.K, QPS A QoS Based Predictive Max-Min, Min-Min Switcher Algorithm for Job Scheduling in a Cloud, Information Technology Journal, Year: 2008, Volume: 7, Issue: 8, Page No.: 1176-1181.
[14] Yagoubi. B, and Slimani. Y, “Task Load Balancing Strategy for Cloud Computing,” Journal of Computer Science, Vol. 3, No. 3, pp. 186-194, 2007.
[15] Dong. F, Luo. J, Gao. L and Ge. L, “A Cloud Task Scheduling Algorithm Based on QoS Priority Grouping,” In the Proceedings of the Fifth International Conference on Cloud and Cooperative Computing (GCC’06), IEEE, 2006.
[16] Etminani .K, and Naghibzadeh. M, “A Min-min Max-min
Selective Algorithm for Cloud Task Scheduling,” The Third IEEE/IFIP International Conference on Internet, Uzbekistan, 2007.
[17] Maheswaran. M, Ali. Sh, Jay Siegel. H, Hensgen. D, and Freund.R.F, “Dynamic Mapping of a Class of Independent Tasks onto Heterogeneous Computing Systems, Journal of Parallel and Distributed Computing, Vol. 59, pp. 107-131, 1999.
[18] Ranganathan, K. and Foster, I., “Decoupling Computation and Data Scheduling in Distributed Data Intensive Applications”, Proceedings of the 11th IEEE Symposium on High Performance Distributed Computing (HPDC-11), Edinburgh, Scotland, July 2002.
[19] Ullah Munir. E, Li. J, and Shi. Sh, 2007. QoS Sufferage Heuristic for Independent Task Scheduling in Cloud. Information Technology Journal, 6 (8): 1166-1170.

Discover more:

About this essay:

If you use part of this page in your own work, you need to provide a citation, as follows:

Essay Sauce, Enhanced Load Balanced Min-Min Algorithm in Cloud Computing. Available from:<https://www.essaysauce.com/computer-science-essays/enhanced-load-balanced-min-min-algorithm-cloud-computing/> [Accessed 19-11-24].

These Computer science essays have been submitted to us by students in order to help you with your studies.

* This essay may have been previously published on EssaySauce.com and/or Essay.uk.com at an earlier date than indicated.